The integrated prefabricated insulation tube is a multi-in-one pipe cable that is pre-fabricated into pipes, high-efficiency insulation materials and protective sleeves for the transfer of high-temperature fluid. During installation, pipe welding and on-site insulation are no longer required. The tube is shipped in super long coil condition, allowing quick and easy installation on existing bridge, pipe gallery, and strut.
Features of integrated prefabricated insulation tube:
◇ Easy to install, save space, installation can reduce environmental pollution to the lowest point.
◇ Ensure the stable operation of the steam system and reduce the failure rate of the trap.
◇ Basically no post-maintenance is required.
◇ Always ensure that the surface temperature is below 60℃, to ensure the personal safety of the staff.
◇ Avoid the traditional way of "solder joint", "leakage point" problem.
◇ The use of new material technology, heat loss is greatly reduced.
Threaded jacketed joint
Weld the sleeve joint
Double socket welding joint
Double sleeve joint
Reducer joints are used for the connection between the tracing station and the adiabatic tube, and between the adiabatic tube and the tracing pipe. Suitable joints can be selected according to the site conditions.
Thermal insulation cotton and aluminum skin
Fireproof silicone cloth and fiberglass cotton